Email: rickwaynes@gmail.com
2 RICKY A WAYNES
14 796 8990 (mobile)
OBJECTIVE:
Skills:
gr To secure a position allowing utilization of my knowledge, skills and abilities to ultimately enhance my professional
owth. My management style is motivational and allows the ability to multi-task in a fast paced environment as well as
building a strong team.
E Microsoft Word, Powerpoint, Excel, Primaver 6 Contract Management and Ten Key, NAVFAC Naval Facilities
Rngineering Command Crane and Railroad Trackage Inspection, Department of Defense (DOD), e-Railsafe System,
I WP, BNSFRR, UPRR, Commuter Rail, OSHA10,OSHA30,CPR,First-Aid,AED,TWIC(Transportation Worker
Ddentification Credential),Crane and Rigging, National Drug Screening Supervisor Training, National Drug Screening
Cesignated Employer Representative (DER) Training, Certificate of Merit of Interviewing People, Life and Safety
onsultants,Inc, DART Roadway Worker Protection Certified, , DART Light Rail Safety Protection Certified
,Principle to Practice of Root Cause Analysis, Control of Hazardous Energy Lockout/Tag Out,
EXPERIENCE:
11-2015 – Present
R L.K.Comstock (A Railworks Company) Electrical
♦ Be responsible for compiling and maintaining necessary records, logs and other reports pertaining to
safety
egional Safety Manager- Quality Control/Quality Assurance Manager- Dart SOC-3
♦ Duties shall be to manage the implementation of the Health and Safety Program over the project’s
personnel, public protection and reporting of equipment and material losses
♦ Manage injuries to assure a high level of medical care and to minimize accident OSHA report ability
and lost time.
♦ Prepare injury reports; maintain required Recordkeeping system; provide adequate documentation on
safety inspections and occupational health monitoring activities.
♦ Conduct Root Cause Analysis Investigative Reports
♦ Establish and monitor the weekly project safety meeting, and any “Toolbox” safety meetings.
♦ Coordinate all project safety training and new-hire safety orientation programs.
♦ Provide and enforce the use at all times of personal protective equipment required
♦ Complete the 24 hour investigation report on all incidents, near misses or accidents.
♦ Work site first aid medical treatment responsibility and emergency first aid program.
♦ Undertake QA/QC audits of suppliers and sub-contractors
♦ Inspect and approve all incoming materials for compliance with the specification
Ensure the development of the Inspection and Test Plans
♦ based on the master project schedule and in compliance with Contract requirements
♦ Ensure required factory tests and inspections are carried out in compliance with Contract requirements
♦ Undertake and ensure QC inspections per the ITP.
Maintain appropriate records of materials and equipment quality requirements, inspections and test
documentation ITP.
Ensure the development plan for final testing and integrated testing of installed equipment and
systems.
♦ Perform audit and surveillance activities.
♦ Prepare and review Quality reports with the officer in charge
2/2014 -11-2015
RailWorks Track Services, Inc.
Regional Safety Manager- Quality Control/Quality Assurance Manager –SO. California
♦ Managed and coordinated all safety and quality testing required for the rail projects including, track, signaling and
communications
♦ Conduct Root Cause Analysis Investigative Reports
♦ Support local project managers on quality and safety issues
♦ Insure construction is performed in accordance with all FRA and OSHA specifications
♦ Prepared all daily logs and retrieved test reports for compliance from our quality labs.
♦ Conducted safety audits to assure compliance with all federal, state and local agencies
♦ Overseeing our Sub-Contractors work to make sure that it meets all FRA, EPA and OSHA compliance
♦ Monitor all work sites to check and validate material and equipment before and during work
♦ Overseeing and test all testing and perform test on the rail
♦ Responsible for all QA-QC-Safety of the New Construction and Rehab work in this Region.
4/2012 - 2/2014
Q RailWorks Track Systems, Inc.
♦ Managed all testing required for the rail project including, track, signaling and communications
♦ Conduct Root Cause Analysis Investigative Reports
♦ Assist Engineering Managers on Federal, State and Local compliance and regulations and issues
♦ Insured construction is performed in accordance with client specifications and with FRA and OSHA compliance
♦ Prepared all daily logs and retrieved test reports for compliance from our quality labs
♦ Establish and conducted safety audits and reports to assure compliance
♦ Overseeing our Sub-Contractors work to make sure that it meets all federal, state and local standards
♦ Go to all off site visits to check material that is going to be use on the job.
♦ Overseeing all testing of the rail and performing test on the rail.
♦ Quality Control/Quality Assurance Manager on the Tucson Modern Streetcar 4 miles of New Construction.
♦ Establish and monitor the weekly project safety meeting, and any “Toolbox” safety meetings.
uality Control/Quality Assurance/Safety Manager-Tucson, AZ
♦ Coordinate all project safety training and new-hire safety orientation programs.
♦ Provide and enforce the use at all times of personal protective equipment required
♦ Complete the 24 hour investigation report on all incidents, near misses or accidents.
♦ Work site first aid medical treatment responsibility and emergency first aid program.
♦ Be responsible for compiling and maintaining necessary records, logs and other reports pertaining to
safety
♦ Duties shall be to manage the implementation of the Health and Safety Program over the project’s
personnel, public protection and reporting of equipment and material losses
♦ Manage injuries to assure a high level of medical care and to minimize accident OSHA report ability
and lost time.
♦ Prepare injury reports; maintain required Recordkeeping system; provide adequate documentation on
safety inspections and occupational health monitoring activities
8/2009-4/2012
Q RailWorks Track Systems, Inc.
♦ Managed all testing required for DART Transit rail project including, track, signaling and communications
♦ Insured construction was performed in accordance with client requirements including FRA and OSHA
♦ Conduct Root Cause Analysis Investigative Reports
♦ Prepared all daily logs and retrieved test reports for compliance from our labs.
♦ Conducted safety audits and provided reports to local managers
♦ Calculated material needs for ordering per the drawings and specifications
♦ Responsible for all direct fixation(concrete) work for the project
♦ Overseeing our Sub-Contractors work to make sure that it meets all specifications of the job.
♦ Visits all work sites to check material and equipment that is going to be use on the job
♦ Quality Control/Quality Assurance/Safety Manager on the Dallas Area Rapid Transit (DART) 5 miles of New
Construction from Garland, Texas to Rowlett, Texas.
uality Control/Quality Assurance/Safety Manager-Dallas, TX
♦ Establish and monitor the weekly project safety meeting, and any “Toolbox” safety meetings.
♦ Coordinate all project safety training and new-hire safety orientation programs.
♦ Provide and enforce the use at all times of personal protective equipment required
♦ Complete the 24 hour investigation report on all incidents, near misses or accidents.
♦ Work site first aid medical treatment responsibility and emergency first aid program.
♦ Be responsible for compiling and maintaining necessary records, logs and other reports pertaining to
safety
♦ Duties shall be to manage the implementation of the Health and Safety Program over the project’s
personnel, public protection and reporting of equipment and material losses
♦ Manage injuries to assure a high level of medical care and to minimize accident OSHA report ability
and lost time.
♦ Prepare injury reports; maintain required Recordkeeping system; provide adequate documentation on
safety inspections and occupational health monitoring activities
11/2007 – 7/2009
BALFOUR BEATTY RAIL, INC.
ASSISTANT AREA MANAGER – HOUSTON, TX
♦ Manage crews of 166 railroad construction workers and professionals in 7 states
♦ Conduct Root Cause Analysis Investigative Reports
♦ Inspect safety and QC rail installation and repair
♦ Review and approve vendor invoices for all projects
♦ Create close-out documents and submit project billing to client
♦ Facilitate emergency derailment dispatch, reduced response time from 3 hours to 1 hour
♦ Reduced manpower per crew from 10 to 6 with no change in productivity results and 10% lower overtime costs
♦ Increased sales by 63% through dedicated business development
♦ Reduced OSHA rating from 3.1 to 1.3
♦ Restructured inventory supply yard for improved response time
♦ Created Standard Operating Procedures (SOP) Manual
♦ Quality Control/Quality Assurance Manager on the KCS 69 Mile Track Of New Construction from Rosenberg,
Texas to Victoria, Texas
01/2005 – 11/2007
ASSA ABLOY HOSPITALITY
OPERATIONS MANAGER
♦ Responsible for staff of 25 shipping, receiving, production and repair employees
♦ Oversee picking, packing and shipping of 300+ orders per day
♦ Increased package accuracy from 84% to 98%
♦ Responsible for $7 million of inventory
♦ Monitor product warranty repair department
♦ Decreased turn time for repair orders from 96 to 48 hours
♦ Determine orders that can be built from existing inventory
♦ Conduct daily cycle counts and bi-annual physical inventory
♦ Developed cycle count and inventory control procedures resulting in 99% inventory accuracy
♦ Determine excess and obsolete inventory items and offer scrapping recommendations
03/2003 – 01/2005
BALFOUR BEATTY RAIL, INC.
QUALITY ASSURANCE MANAGER / QUALITY CONTROL MANAGER - LARGO, MD
♦ Managed crew of 46 rail construction workers
♦ Conduct Root Cause Analysis Investigative Reports
♦ Monitored project safety and quality activities and completed schedules for construction
♦ Calculated material quantities and verified placements
♦ Performed construction audits to determine compliance with client specifications and all FRA requirements
♦ Conducted safety audits
♦ Managed and performed all testing requirements for the project
♦ Responsible for all direct fixation(concrete) work for the project
05/2000 – 03/2003
BALFOUR BEATTY RAIL, INC. (CONT’D)
Q QUALITY ASSURANCE MANAGER / QUALITY CONTROL MANAGER / PROJECT ENGINEER – GUAYNABO, PR
♦ Managed all testing required for the rail project
♦ Conduct Root Cause Analysis Investigative Reports
♦ Insured construction was performed in accordance with the specifications
♦ Served as liaison between the owner and the contractor
♦ Prepared daily logs and retrieved test reports for compliance
♦ Conducted safety audits
♦ Calculated material needs for ordering per the drawings and specifications
♦ Responsible for all direct fixation(concrete) work for the project
12/1991 – 04/2000
WARREN GROUP
UALITY ASSURANCE MANAGER / QUALITY CONTROL MANAGER / PROJECT ENGINEER – DALLAS, TX
QUALITY CONTROL MANAGER / OPERATIONS MANAGER
♦ Managed 37 employees responsible for manufacturing electrical cell harnesses
♦ Reviewed plans and drawings
♦ Monitored production for compliance to specifications
♦ Served as liaison between the production company and customers
♦ Responsible for shipping completed products
EDUCATION:
Central State University, Oklahoma
REFERENCES AVAILABLE UPON REQUEST